Oberglinde - Klein Offenseth
ETL 189
Schleswig-Holstein – Hydrogen Bridge for Northern Germany
Hydrogen is one of the key components of the energy transition and will play an essential role in enabling German industry to achieve CO2 neutrality. This will only be possible if the infrastructure required to transport hydrogen is in place. Schleswig-Holstein, in particular, occupies a central position due to its proximity to the large volumes of hydrogen expected to be available in Denmark. To support this, Gasunie is planning to construct and subsequently operate the 22-kilometre Energy Transport Pipeline (ETL) 189 from Oberglinde to Klein Offenseth.
| October 2024 | Feasibility study |
| September 2025 | Start of ground investigations and further preliminary surveys |
| November 2026 | Information events marking the start of the Right of Way acquisition process |
| Q4 2026 | Submission of the planning approval application |
| Q1 2027 | “Gasunie vor Ort” – public information events |
| Q4 2027 | Potential start of early construction works, subject to approval |
| Q1 2028 | Receipt of the planning approval decision; anticipated start of construction |
| End of 2028 / beginning of 2029 | Technical completion |
| Q1 2029 | Operational readiness |
To supply Germany with climate-neutral hydrogen in the future, a high-performance transport infrastructure is required. The foundation for this is the national hydrogen core network, which was approved by the Federal Network Agency in October 2024. Through its Hyperlink project, Gasunie Deutschland, as a transmission system operator within the meaning of the German Energy Industry Act (EnWG), is actively involved in developing this network.
The construction of the new Energy Transport Pipeline (ETL) 189 between Oberglinde and Klein Offenseth is an important building block of Germany’s hydrogen network. Due to its proximity to Denmark, one of the most important future producers of green hydrogen, Schleswig-Holstein has a key role to play in the energy transition. Within Hyperlink, ETL 189 forms part of the Hyperlink 3 sub-project. ETL 189 enables these hydrogen volumes to be transported to key industrial regions in Germany and north-western Europe.
As part of the hydrogen core network, ETL 189 will also enable future projects in Schleswig-Holstein to connect to the German and European hydrogen infrastructure. This applies both to potential production and import sites, for example on Germany’s North Sea coast, and to potential consumers in the vicinity of the newly constructed pipeline.
Hyperlink 3 and NORTHLINK H2
ETL 189 is part of Gasunie’s Hyperlink 3 project, which establishes the first direct hydrogen connection between Germany and Denmark. As part of the German-Danish NORTHLINK H2 project, together with the DHB1 project of the Danish transmission system operator Energinet, Hyperlink 3 forms a key building block of the future north-west European hydrogen market. The infrastructure is therefore being developed in close cooperation between the two partners and connects the German industrial regions of Stade and Brunsbüttel with future hydrogen production sites in Denmark.
At the same time, Hyperlink 3 connects the German hydrogen core network to key import, storage and consumption sites in northern Germany. Like the Hyperlink project as a whole, Hyperlink 3 will largely be implemented by converting existing natural gas pipelines. As in the case of ETL 189, new-build sections will be added where existing infrastructure cannot be used.
| District affected | Kreis Pinneberg |
| Total length | 24 km |
| Nominal pipe diameter | 900 mm |
| Maximum operating pressure (MOP) | 84 bar |
| Medium | Hydrogen |
| Width of protective strip | 10 m |
| Width of standard working strip | 38 m |
| Width of restricted standard working strip | 18 m |